Event Recorder Printout of Three Mile Island Accident


Page 10





03:55:39	Engineered Safeguards actuated on low RCS pressure.  Setpoint is
(0756:16)   
		1640 psig.



03:55:39	The Reactor Building high pressure isolation signal actuated
(0756:16)
		and isolated the Reactor Building.  The Reactor Building isolation

		set point is 4 psig.



03:56:04	Reactor Coolant Makeup Pump C (MU-P-1C) was started.
(0756:41)


03:59:23	Reactor Building Emergency Cooler B was shutdown.
(0800:00)


03:59:53	Reactor Building Emergency Cooler B was started.
(0800:30)


04:06:00	Electromatic Relief Block Valve (RC-V2) was shut.
(0806:37)


04:08:39	Reactor Coolant Pump 1A (RC-1A) was started.
(0809:14)


04:09:14	Reactor Coolant Pump 1A (RC-P-lA) was stopped.
(0809:51)


04:l7:17	Reactor Coolant Makeup Pump A (MU-P-1A) was stopped.
(0817:54)


04:17:22	Reactor Coolant Makeup Pump C (MU-P-1C) was stopped.  No makeup
(0817:59)
		pumps operating.


04:18:17	Operator attempted to start Reactor Coolant Makeup Pump A (MU-P-1A).
(0818:54)
 		The pump would not start.


04:18:30	Electromatic Relief Block Valve (RC-V2) was opened.
(0819:07)
Approximate 



- 10 -


[Home] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] [13] [14] [15] [16] [TMI #2 Diagram]

E-Mail --Webmaster@disastercity.com


Back to Disaster City