10:31:25 Reactor Coolant Makeup Pump C (MU-P-1C) was started. Reactor
(1432:02)
Coolant pressure was approximately 440 psig.
10:35:55 Reactor Coolant Makeup Pump C (MU-P-1C) was stopped.
(1436:32)
11:06:00 Pressurizer level started decreasing.
(1406:37)
Approximate
11:12:00 Reactor Coo1ant System cold leg Loop A temperature started to
(1512:37)
Approximate increase from 200F to 400F. Reactor Coolant System hot leg Loop A
temperature decreased from above the instrument range to 560F.
11:18:34 Reactor Coolant Makeup Pump C (MU-P-1C) was started.
(1519:11)
11:24:00 Pressurizer level stopped decreasing at 180 inches and started
(1524:37)
Approximate increasing, going off scale during the next hour.
11:28:12 Reactor Coolant Makeup Pump C (MU-P-1C) was stopped.
(1528:49)
11:32:37 Reactor Coolant Makeup Pump C (MU-P-1C) was started.
(1533:14)
11:35:48 Reactor Coolant Makeup Pump C (MU-P-1C) was stopped.
(1536:25)
11:36:00 Operator commenced filling Steam Generator B to 97% on the Operating
(1536:37)
Approximate Range instrumentation.
12:00:00 Steam Generator A level was 97% on the Operating Range.
(1600:37)
Approximate
12:48:00 Pressurizer level came on scale.
(1648:00)
Approximate
- 13 -