13:02:23 Condenser Vacuum Pump 1C (VA-P-1C) was started. (1703:00) 13:08:22 Norma1 steam generator feedwater supply was put in service. (1708:59) Approximate 13:13:10 Condenser Vacuum Pump 1A (VA-P-1A) was started. (1713:47) 13:23:04 Reactor Coolant Makeup Pump C (MU-P-1C) was started. (1723:41) 14:43:15 Reactor Coolant Makeup Pump C (MU-P-1C) was stopped. (1843:52) 14:54:00 RCS pressure reached 2350 psig. (1854:37) Approximate 15:24:00 Reactor Coolant Pump 1A (RC-P-1A) was started. (l924:37) 15:24:10 Reactor Coolant Pump 1A (RC-P-1A) was stopped. (1924:47) Approximate 16:04:00 Reactor Coolant Pump 1A (RC-P-1A) was started. (2008:37) 22:15:00 Reactor Coolant System and Steam Generator conditions were: (0215:37) Approximate Reactor Coolant System pressure = 1065 psig. Pressurizer Temperature = 551F (pressurizer heaters maintaining temperature). Pressurizer Level = 397 inches. Reactor Coolant System cold leg Loop A temperature = 288F Steam Generator A steaming to the Main Condenser.- 14 -