01:13:29 Reactor Coolant Pump 2B (RC-P-2B) was stopped.
(0514:06)
01:13:42 Reactor Coolant Pump 1B (RC-P-1B) was stopped.
(0514:19)
01:13:27 The alarm printer became unavailable at this time and remained
(0513:59)
out of service until 02:47:31 (0648:08).
01:20:31 Operator requested printout of the Electromatic Relief Valve
(RC-RV2) outlet temperature. The reading was 283.0F.
01:40:37 Reactor Coolant Pump 2A (RC-P-2A) was stopped.
(0541:14)
01:40:45 Reactor Coolant Pump 1A (RC-P-1A) was stopped.
(0541:22)
01:42:00 Operator started raising Steam Generator A level from 30 inches
(0542:37)
Approximate on the Startup Range to 50% on Operating Range. Reactor Coolant
System Loops A and B cold leg temperatures both started decreasing.
Reactor Coolant System pressure started decreasing.
01:54:00 Reactor Coolant System Loop A hot leg temperature began increasing.
(0554:37)
Approximate
02:00:00 Steam Generator A level reached 50% on Operating Range.
(0600:37)
Approximate
02:00:00 Reactor Coolant System Loop B hot leg temperature began increasing.
(0600:37)
02:12:00 Reactor Coolant System Loop B hot leg temperature increased to
(06l2:37)
offscale at 620F.